1 search results for:

1

Construction at LifeTown is picking up speed

Construction at LifeTown is picking up speed as all the exciting rooms are beginning to take shape. The zero-entry pool is dug and the piping for the interactive features are in place. The stud walls are going up throughout the building and the Life Village stores are starting to look real. The steel supports are in place over the entry level and the floor will be going in next week. The foundation has been poured and lower walls are built for the main entrance and the steel will be going up very soon. The corner stone from Jerusalem was placed in the entry wall.