Site work begins at LifeTown
Construction at LifeTown is heating up on many fronts. Site work has begun with the (former) upper parking lot becoming a great outdoor ballfield and the new driveway entrances being cleared.
Construction at LifeTown is heating up on many fronts. Site work has begun with the (former) upper parking lot becoming a great outdoor ballfield and the new driveway entrances being cleared.
Gym roof is up, lower level wall is almost finished and interior walls are starting to go up… another week of great progress at LifeTown!
Steel frame for the gym is in place and the gym will be closed in next week. Entry level excavation is complete and the footings are being poured for the new wall. Skylights and air ducts are being installed.
We are proud to announce that Wakefern Food Corp./ShopRite has come on board as partners!
With construction well underway we look forward to the grand opening this fall.
Hollister Construction Services contractors were very busy this week at LifeTown digging the entry level, building the steel frame for the gym and multipurpose room, and working on the roof skylights and air systems.
The gym wall is complete and ready for the new roof. The temporary support is in place and the entry level will be dug starting next week.
New concrete supports have been poured and the drain pipes have been installed. The gym wall is nearly complete and the entry level is being prepped for excavation.
LifeTown reconstruction is in high gear!Learn more and participate in the campaign @ www.LifeTown.com#lifetown #FCNJ – Friendship Circle Posted by Zalman Grossbaum on Friday, March 31, 2017
https://www.youtube.com/watch?v=79mqs2KQaGg
Soon that opening will welcome more than 35,000 people each year!