4 search results for:

1

Raising the Roof on LifeTown

Work continues throughout LifeTown with the new roof structure being constructed. As the summer heats up the ducts for the air system are being hung and the 5 skylights in Life Village have been installed. The underpinning for the lower level is complete and the new drain pipes are being installed. The main entrance is also starting to take shape.

4

Site work begins at LifeTown

Construction at LifeTown is heating up on many fronts. Site work has begun with the (former) upper parking lot becoming a great outdoor ballfield and the new driveway entrances being cleared.